The project map
Hospitals, schools, mines, wind farms and roads — where the work is, who is doing it, and which jobs are open on each site.
34 projects
34 projects
St. John's · $693M · 2025–2029
The replacement for Her Majesty's Penitentiary — the province's largest building project, running to 2029.
Holyrood · $891M · 2026–2030
A roughly 150 MW combustion turbine at Holyrood — an $891M, four-year program starting on site in 2026.
Come By Chance · $1.8B · Until Dec 2030
45 turbines and a hydrogen plant near Sunnyside — the one NL wind-hydrogen project still clearly moving.
Labrador
A 2,700 MW dam on the Churchill River — agreed in principle in August 2026, not sanctioned, in service 2036-37.
Channel-Port aux Basques · $270M · From Jun 2026
$270M of federal work on the ferry terminals at Port aux Basques and Argentia, with procurement beginning.
Central · $436M · 2026–2028
Doubling the mill at Valentine Lake from 2.5 to 5.0 Mtpa — approved in August 2026, construction starting now.
Happy Valley-Goose Bay · $187M · 2026–2030
A $187M conversion of the base heating plant from diesel to electric, running May 2026 to December 2030.
Central · $1.1B · From Jan 2028
A proposed eighth generating unit at Bay d'Espoir — the cost and the schedule are both being publicly challenged.
St. John's
A deepwater oil development in the Flemish Pass — still not sanctioned, with a final decision targeted for early 2027.
Western
A 150-bed long-term care home at Stephenville Crossing — the site was expropriated in 2025, construction is still to be scheduled.
Come By Chance
A proposed sustainable-aviation-fuel expansion at Come By Chance. The refinery runs; Phase II is a plan only.
Churchill Falls
Proposed upgrades at Churchill Falls plus 2,000 MW of Labrador wind — the expansion was pulled from the 2026 deal.
Clarenville
A 54-bed long-term care home for Clarenville — planning money only so far, no tender yet.
Conception Bay South · $16M
A 100,000 sq ft recreation centre for CBS — the design was reworked in 2026 and the opening date is open again.
Argentia · $100M · 2026–2027
A 448-metre dock with three berths and a roll-on/roll-off ramp at Argentia — funded, but reported to be at risk.
Corner Brook · $21M · 2025–2028
Converting the old Western Memorial hospital into a community health centre with 45 more long-term care beds.
Deer Lake · $60M · From Apr 2027
About 2,000 m² more terminal at Deer Lake, tender-ready in early 2027.
Central · $25.8M · From Apr 2025
A $25.8M extension and redevelopment of Dorset Collegiate at Pilley's Island, under way now.
Gander · $5.7M · 2026–2028
$5.65M of water and sewer replacement on two Gander streets, funded and running 2026 to 2028.
Wabush
An iron ore mine southwest of Wabush — feasibility study due end of 2026, then a 48-month build if it is sanctioned.
St. John's · $41.9M · Until Aug 2027
An 860-student school in Kenmount Terrace, about 35% built as of spring 2026.
Labrador City · $1B
A 735 kV line from Churchill Falls to Labrador City with a new terminal station — engineering through 2026.
Central · $7.7M · 2026–2028
A $7.68M replacement water treatment plant for Lumsden, funded for 2026 to 2028.
Corner Brook · $9.8M · 2026–2027
A 20-unit affordable apartment building on Crestview Avenue — contract awarded, starting summer 2026.
Happy Valley-Goose Bay · $22M · 2026–2028
$22M to redevelop Paddon Home and add eight transitional beds at the Labrador Health Centre.
St. John's
Between 1,000 and 1,300 new homes on the old Pleasantville lands, with a builder partner still to be chosen.
St. John's · $139M · 2028–2031
Adding secondary treatment at Riverhead — a process build with about two years of design ahead of it.
Rocky Harbour · $7M · 2026–2028
A $6.96M new water supply for Rocky Harbour in Gros Morne, funded for 2026 to 2028.
Eastern (Burin & Bonavista) · May 2026
Rebuilding the Bonavista Highway between Lethbridge and Southern Bay in the 2026-27 season.
St. Anthony · $5.4M · 2026–2028
A $5.44M waterline replacement on East Street in St. Anthony, funded for 2026 to 2028.
St. John's · $30M · 2024–2026
The last 3.3 km of Team Gushue Highway, on track to open in the fall of 2026.
Bishop's Falls · From May 2026
Fifteen kilometres of TCH twinning between Bishop's Falls and Grand Falls-Windsor, from 2026 onward.
Whitbourne · From May 2026
About 40 km of TCH twinning west of Whitbourne, now being let as traditional contracts after the P3 was cancelled.
Argentia · $2B · Until Dec 2026
The concrete gravity structure and topsides at Argentia — about 85% done, with first oil expected in 2026.
Where this comes from.
Every project links to the announcement it came from — a government release, the proponent, or local news. Values and dates are whatever was made public; when nothing was published we leave it blank instead of guessing.
Last updated September 14, 2026.