A 448-metre dock with three berths and a roll-on/roll-off ramp at Argentia — funded, but reported to be at risk.
What’s being built
The Port of Argentia plans a 448-metre dock with three berths and a roll-on/roll-off ramp, backed by about $38 million federal and $15.1 million provincial funding against a roughly $100 million project. Construction was to start in 2026 and finish around 2027. It is worth watching rather than counting on: the collapse of the wind-hydrogen projects that were to use the port, plus a reported tax dispute, have put the business case under pressure. Marine piling, heavy civil and steel fabrication are the trades involved.
Workforce
At risk — the hydrogen projects that underpinned the demand for it did not proceed.
Trades needed
These are the trades the project is expected to need. Tap one to see open jobs in that trade anywhere in the province.
Key facts
Money or intent announced. No shovels yet.
Argentia · Avalon Peninsula
Open jobs on this project
No employer has posted a job on this project yet. Follow it and we'll tell you the day one lands.
Work on a project like this is usually posted a few weeks before it starts. Following it puts you at the front of the line.
Follow this projectArgentia · Announced
Workers: a profile takes about eight minutes and it is the whole application — no resume, no cover letter. Employers: attach your posting to this project so the right people find it.